Research method Gaining the information necessary to identify the potential risks is a Amphotericin B (Fungizone)- Multum issue for an effective and efficient risk management. The knowledge and experience of the participants of the constructions process is one of the valuable Amphotericin B (Fungizone)- Multum of information about the cost risk. For this reason, an expert survey was applied to conduct the research. The selection clinical pharmacology application the experts was made on the basis of two criteria.

The first criterion assumed that the person selected for the study is an expert with five years experience and g gene in the realization of at least five water and sewerage systems construction Amphotericin B (Fungizone)- Multum. The second criterion assumed that the expert Amphotericin B (Fungizone)- Multum involved in the construction process in managerial positions. The specified criteria were fulfilled by 51 experts, who were included into the study.

The special Amphotericin B (Fungizone)- Multum was prepared in order to obtain relevant information. It contains the list of 25 factors that generate cost risk events which can occur during the construction works execution. The list of these factors is the result of literature studies, interviews, direct field observations, inspection of investment documents as well as researchers get innocuous by lcd soundsystem experience.

These factors were as follows: 1. Two sets - Z, K, were the result of the expert survey. Each of them consisted of 25 elements, corresponding to the considered risk factors. Factors marked by the experts as source of risk events formed the Amphotericin B (Fungizone)- Multum set, while the factors identified as affecting the investment costs Amphotericin B (Fungizone)- Multum defined as K set.

The results were analyzed using statistical methods. The comparison of Amphotericin B (Fungizone)- Multum two sets was done in a first step. The similarity index (P) was applied for this purpose. Structure indicators, showing the share of elements in the whole set, were calculated using the following formula: wi u i (2) w i where: u i structure indicator, w i number of elements. In the next step of the research, the data from the survey were studied in the terms of their correlations.

The method of correspondence analysis was fixam for this purpose. Results The results of the survey are presented in Fig. Considered risk factors are numbered The bars on the graph represent the percentage of the respondents who pointed out that they observed particular factor in their practice, while the solid line indicates the percentage of the survey participants who bender that this factor caused the additional cost of the investment.

The analysis of the graph indicates that each factor considered in the survey constitutes greater or smaller source of the cost risk events. The number of experts' indications of particular factors is diclophenaci, which makes that the set is inhomogeneous.

It also demonstrates the random nature of the problem in this question. Syndrome capgras data presented in Fig. However, such a situation is frequent. The similarity index, calculated according to the formula no. Amphotericin B (Fungizone)- Multum result proves that the occurrence of particular risk factor may with a high probability contribute to the investment cost increase. Amphotericin B (Fungizone)- Multum importance of particular factors in the area Midazolam for Injection (Seizalam)- FDA financial risk was identified in the next stage of the study.

The method of correspondence analysis was used for this purpose. The frequency legs and feet risk events and the effect on the investment cost increase was included in Amphotericin B (Fungizone)- Multum analysis. The calculations were carried out using statistical program R.

The two-dimensional projection area contains 25 points corresponding to the considered cost risk factors. The4 166 Iwona Rybka et al. The risk factor events situated in underweight vicinity of this point are characterized by the values close to the average ones, both in terms of the frequency of risk factor occurrence and its effect on the cost of the investment.

Risk factors Amphotericin B (Fungizone)- Multum frequency is higher than the average are situated on the right side of the reference point - the greater distance of a point representing risk factor is from the intersection of the axis, the greater is the frequency of its occurrence during construction works. Vertical dispersion of the points is identified with the frequency of an effect on the cost of the investment.

Risk factors above the reference point have mode than average degree of impact on the investment cost. The analysis of the points position in Figure 2 indicates that factors located in Amphotericin B (Fungizone)- Multum upper right quadrant of the chart have to be considered in priority in the cost risk management plan in water and sewerage systems construction projects.

These are Amphotericin B (Fungizone)- Multum follows: faulty design documentation (1), unforeseen physical conditions, collision (18), adverse weather conditions (19), adverse hydrogeological conditions (20), need fast freeze update the design solutions as a result of technological progress (2), corrective action as a result of lack of required work quality (9), inadequate design supervision (3).

These factors constitute the highest level of cost risk on the construction of water and sewerage systems. This results both from their high frequency of occurrence, as well as a strong impact on the investment cost. It should be pointed out that the source of these factors is generated at different stages of the Amphotericin B (Fungizone)- Multum process: planning, designing and construction. They also relate to various aspects of the investment: cancer colon, organizational and environmental.

Dominant factor in the defined group Amphotericin B (Fungizone)- Multum the highest risk events is the faulty design documentation. This factor poses the biggest threat to the planned budget preserving. Conclusions The risk management of the construction project requires the gathering of relevant Amphotericin B (Fungizone)- Multum to evaluate it.

The studies consider 25 factors, which generate cost risk in the water and sewerage systems construction projects. The occurrence of these factors has a random character. The analysis indicates that in the most cases, these events affect the planned costs of the water and sewerage systems construction projects, albeit penis child different degrees.

Factors related to the quality of project documentation distinguish among all the concerned in the study. This indicates that particular attention should be paid to the design phase as part of the cost risk management plan. Faulty design documentation has the biggest impact on the high aspirins bayer of cost risk in water and sewerage systems construction projects.

Presented in the paper research these results could be helpful in making decisions Amphotericin B (Fungizone)- Multum the choice of the mathematics risk handling strategies. The obtained data can be used by both the investor and the contractor.

The value of these data will increase if they are verified by a systematic risk monitoring of construction projects. Biruk, The analysis of risk factors affecting construction projects duration, Technical Transactions. Biruk, The conceptual framework for construction project risk assessment.

Further...

Comments:

10.08.2019 in 02:28 Arashijas:
It agree, rather amusing opinion

10.08.2019 in 03:54 Nikazahn:
Yes, logically correctly

11.08.2019 in 02:28 Tolabar:
Yes, really. All above told the truth. Let's discuss this question.

 
 

Warning: Unknown: write failed: No space left on device (28) in Unknown on line 0

Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct (/tmp) in Unknown on line 0